,

Refurbished Tubular Scaffolding

Contact us for price

This surplus site infrastructure package includes 50 complete sets, providing a total of 100 frames, 100 cross braces, and 40 joint pins. Manufactured to strict MS 1462 and BS 1139 standards, the components feature a resilient hot-dipped galvanized finish to withstand continuous outdoor exposure.

• Standard: MS 1462 / BS 1139

• Finish: Hot Dipped Galvanized

• Qty: 50 Sets (100 Frames, 100 X-Braces, 40 Joint Pins)

Ownership Verified

Basic Inspection Report: Available upon request

Maintenance Log Summary: Available upon request

✔ Third-party inspection

✔ Delivery & unloading assistance

✔ Planned maintenance package

Scroll to Top